Sewer blockages don’t arrive overnight

Friday, 26th April 2019

Concrete-Hall Street-Islington

Concrete in sewer under Hall Street, Islington, will take two months to remove

• TO hear Thames Water suddenly found a 105-ton blockage is not very credible, (Concrete blockage in sewer, News online, April 19).

These sewers are inspected often and a build-up like this would take time. This was no “accident” and someone at Thames needs to explain why this was never discovered and controlled earlier.

LUKE DEACON
Address supplied

Related Articles